RLC has developed generator, line, bus, and transformer protective relay settings, supported construction activities and supervised or performed testing and commissioning activities for the following projects.
- 61850 Standards Review and Update
- Coordination Studies and Settings Design
- Area Directional Instantaneous Ground-overcurrent Removal Coordination Study
- Bristol Substation
- Canton Mountain Wind Farm
- Eight Flag CHP Relay Settings (Nationally Recognized Award winning project, Power Engineering 2016 Best Project Award)
- Ludden Lane Substation
- Northfield Mountain
- Passadumkeag Wind
- Pisgah Wind Farm
- Saddleback Ridge Wind
- South China Substation
- South Sanford Substation
- NERC Compliance Settings Review
- Berkshire Power
- Cabot Station
- Millstone Power
- Northfield Mountain
- Relay Settings Design
- Bear Swamp Substation
- Mount Support #16 Substation – Wilder #16 Substation 69kV Lines
- Multiple Three-terminal 115kV Line Settings Designs
- Sandy Pond Wachusett Line Settings 345kV Lines