Interconnect Cost Estimate

The cost estimate for this project included a new 6 breaker 115kV switch station which bisected an existing 138kV overhead transmission line. This new ring bus will be used as the Point of Interconnect (POI) for a new 50MW photovoltaic generating facility.
SCOPE OF SERVICES
- Cost for transmission line upgrades and removals for the installation of the new switching station
- Cost estimate for the 115kV switch station civil and electrical installations
- Cost estimate for installation of fiber communications and remote end substation protection and control upgrades