RLC Engineering excels in providing modeling services to ensure strict compliance with the NERC MOD standards, including MOD-025-2, MOD-026-1, MOD-027-1, and MOD-032-1. Their expertise lies in meticulous verification and validation of generator and control system models, guaranteeing accuracy and adherence to regulatory requirements. By offering comprehensive modeling services, RLC plays a vital role in supporting entities to meet NERC standards and maintain reliability in the Bulk Electric System.

NERC MOD-025-2 – Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability

  • Key Requirements:
    • Validation of generator real and reactive power capabilities and synchronous condenser reactive power capability.
    • Data reporting for planning model assessment.
    • Compliance with data quality and reporting standards.

NERC MOD-026-1 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions

  • Key Requirements:
    • Regular validation of generator excitation or plant volt/var control models.
    • Periodic audits and data verification.
    • Compliance with simulation model standards.

NERC MOD-027-1 – Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions

  • Key Requirements:
    • Validation of turbine/governor and active power/frequency models.
    • Regular testing and data validation.
    • Compliance with simulation model accuracy standards.

NERC MOD-032-1 – Data for Power System Modeling and Analysis

  • Key Requirements:
    • Implementation of standardized modeling data requirements.
    • Timely and accurate reporting for system reliability analysis.
    • Compliance with power system modeling standards

Department

Power Generation

Service

NERC MOD Standards
Download

No related publications found.