        Experience
        Millyard Substation
        The Millyard Substation project included retiring the existing 34.5  –
        4.16 kV substation and building a new substation on the adjacent
        property. The new substation included two new 34.5-4.16 kV,
        10 MVA transformers, two new 34.5 kV circuit breakers, and one
        new 4.16 kV metalclad switchgear, including relaying and battery
        systems. RLC created the Detailed Engineering documents required
        to construct the project.
        MEPCO 392,396 & 3001 Structure Replacement
        The MEPCO Project was for the design of replacement structures
        for three, 345 kV transmission lines. The lines stretch 127 miles
        and include over 1000 structures. In addition to the structure
        replacement design, RLC also developed a design criteria document
        to specify present and future transmission system modification
        design requirements. Deliverables included construction documents,
        construction specifications, material list and plan and profiles.
        South Meadow Breaker Replacement
        RLC provided design services for the replacement of thirty-eight,
        23 kV oil circuit breakers. The work also included the replacement
        of twenty-one each disconnect switches as part of the Bus
        Rehabilitation and nine Relay Replacements. RLC developed all
        design documents required for construction. Construction support
        services were provided along with as-built documents. Rehabilitation
        and nine Relay Replacements. RLC developed all design documents
        required for construction.
        Capital Investment (Estimating Services)
        RLC provides a complete portfolio of estimating services ranging
        from level 1 to 4 for all major design discipline activities. Services
        range from basic scoping to complete system upgrade detailed
        Estimates of Probable Cost. Our clientele include Renewable Energy
        Developers, Utilities and Independent System Operators. RLC is well
        versed in all major Northeast utility estimating procedures along with
        ISO-NE’s Procedure 4, and +- 50%/25% Estimate of Probable Cost
        process.

        Facilities Studies
        RLC continuously performs studies to identify equipment and related
        costs necessary to design, engineer, procure, construct, install,
        test and commission the subject Project and Project’s Network
        Upgrades Facilities (NUF) necessary to reliably interconnect to the
        Transmission Owner’s system. RLC works with the subject Project’s
        Developer and Connecting and Affected Transmission Owner(s) to
        ensure the Project is performed in accordance with the Scope of
        Work.