The design of this project was engineered to address bulk substation transformer overloads and resolve distribution feeder issues by improving system reliability and increasing load-carrying capability

SCOPE OF SERVICES

  • Improved system reliability by installing new primary & secondary line protection on the 1342, 1598, and 1261 transmission lines.
  • Increased substation Load Carrying Capability (LCC) by replacing two existing 50 MVA bulk distribution transformers with three new 62.5 MVA transformers
  • Added three 115 kV circuit breakers to make a six breaker ring bus.
  • Converted the 27.6 kV distribution system to 23 kV
  • Increased feeder positions from six to nine by adding a switchgear lineup that will interconnect with the existing open bus.
  • Increased feeder limits and flexibility of circuit ties at 23 kV.
  • Provided construction support services including RFI’s, submittal reviews and on-site visits for installation verifications.

Department

Power Delivery

Service

Substation Design